|
Site for new building
|
Grading the site
|
Installing infrastructure
|
Installing Infrastructure
|
|
Steel Framing
|
Framing for Linac
|
Steel Framing
|
Steel Support of Interior
|
|
Framing for linac
|
Concrete for linac
|
Front stair well
|
Front stair well
|
|
Front stair well
|
Installation of exterior glass walls
|
Front stair wells
|
Fire proofing structure
|
|
Window of lobby
|
First floor exterior walls
|
First floor nearing completion
|
Chemotherapy room
|
|
Exterior wall
|
Exterior wall
|
Exterior view
|
Oncology lab
|
|
Oncology lab
|
Breezeway construction
|
Breezeway construction
|
Completed breezeway
|
|
Completed breezeway
|
Second floor lobby
|
First floor lobby
|
Completed facility
|